Path to Production

The Company's objective is to become a strategic  supplier of battery-grade lithium hydroxide and other chemicals to the growing electric vehicle and energy storage markets in North America. Frontier aims to complete final permitting, metallurgical testwork and definitive feasibility in 2023 to construct and mine, mill and downstream chemical plant to produce lithium chemicals by 2025.*

Currently Conducting:

Mine Development

Spark In-Fill drilling ongoing as a part of the planned Phase IX diamond drill program on the PAK Lithium Project.

Spodumene Concentrates

Permitting for an Advanced Exploration sample with the option to build a demonstration concentrator producing spodumene concentrates for both battery and glass users.

Lithium Chemicals

Producing premium chemical grade concentrate feedstock for the ongoing  lithium chemicals testwork.

PEA Initial Results:

Preliminary Economic Assessment for a proposed mine-to-lithium hydroxide chemical/hydromet plant facility in the Great Lakes Region of North America. The fully Integrated Project PEA assumes a hydromet plant that would convert spodumene concentrate feedstock sourced from open-pit mining and a milling facility at the Company’s PAK Lithium Project. Read the PEA results announcement here.

PEA Table.png
Accelerated Production Plan

*The project timelines are estimates and subject to adverse developments in business and economic conditions in the principal markets. The accelerated timeline is under study during Pre-Feasibility Study. For more information; Disclaimer.